My Haas Welcome,
!
Haas Tooling MyHaas/HaasConnect Sign In Register Haas Tooling MyHaas/HaasConnect Sign Out Welcome, My Machines Latest Activity My Quotes My Account My Users Sign Out
Find Your Distributor
  1. Select Language
    1. English
    2. Deutsch
    3. Español - España
    4. Español - México
    5. Français
    6. Italiano
    7. Português
    8. Český
    9. Dansk
    10. Nederlands
    11. Magyar
    12. Polski
    13. Svenska
    14. Türkçe
    15. 中文
    16. Suomi
    17. Norsk
    18. الإنجليزية
    19. български
    20. Hrvatski
    21. Ελληνικά
    22. Română
    23. Slovenský
    24. Slovenščina
    25. 한국어
    26. 日本語
    27. Українська
  • machines Main Menu
    • Vertical Mills
      Vertical Mills
      Vertical Mills View All
      • Vertical Mills
      • VF Series
      • Universal Machines
      • VR Series
      • VP-5 Prismatic
      • Pallet-Changing VMCs
      • Mini Mills
      • Mold Machines
      • High-Speed Drill Centers
      • Drill/Tap/ Mill Series
      • Toolroom Mills
      • Pocket Mill
      • Compact Mills
      • Gantry Series
      • SR Sheet Routers
      • Extra-Large VMC
      • Double-Column Mills
      • 3+2 Positioning Machines
    • Multi-Axis Solutions
      Multi-Axis Solutions
      Multi-Axis Solutions View All
      • Multi-Axis Solutions
      • Y-Axis Lathes
      • 5-Axis Mills
    • Lathes
      Lathes
      Lathes View All
      • Lathes
      • ST Series
      • Dual-Spindle
      • Box Way Series
      • Toolroom Lathes
      • Chucker Lathe
      • Haas Bar Feeders
    • Horizontal Mills
      Horizontal Mills
      Horizontal Mills View All
      • Horizontal Mills
      • 50-Taper
      • 40-Taper
    • Rotaries & Indexers
      Rotaries & Indexers
      Rotaries & Indexers View All
      • Rotaries & Indexers
      • Rotary Tables
      • Indexers
      • 5-Axis Rotaries
      • Extra-Large Rotaries
    • Special Series
      Special Series
      Special Series View All
      • Special Series
      • EU_Series_Redirect
    • Automation Systems
      Automation Systems
      Automation Systems View All
      • Automation Systems
      • Mill Automation
      • Lathe Automation
      • Automatic Parts Loaders
      • Automation Models
    • Desktop Machines
      Desktop Machines
      Desktop Machines View All
      • Desktop Machines
      • Desktop Mill
      • Desktop Lathe
      • Control Simulator, Standard
      • Control Simulator, Premium
    • Shop Equipment
      Shop Equipment
      Shop Equipment View All
      • Shop Equipment
      • Knee Mill
      • Haas Manual Lathes
      • Haas Saws
    • Fabrication Machines
      Fabrication Machines
      Fabrication Machines View All
      • Fabrication Machines
      • Laser Cutting Machines
      • CNC Press Brakes
    • QUICK LINKS Special Series  Special Series 
      EU SERIES EU SERIES BUILD & PRICE | PRICE LIST BUILD & PRICE | PRICE LIST In-Stock Machines In-Stock Machines WHAT’S NEW WHAT’S NEW YOUR FIRST CNC YOUR FIRST CNC
      SHOPPING TOOLS
      • Build & Price a Haas
      • Price List
      • Available Inventory
      • CNCA Financing
      WANT TO TALK TO SOMEONE?

      A Haas Factory Outlet (HFO) can answer your questions, and walk you through your best options.

      CONTACT YOUR DISTRIBUTOR >
  • Options Main Menu
    • The Haas Control Value Option Packages
      Value Option Packages
      Value Option Packages View All
      • Value Option Packages
    • Product Image Spindles
      Spindles
      Spindles View All
      • Spindles
    • Product Image Tool Changers
      Tool Changers
      Tool Changers View All
      • Tool Changers
    • Product Image 4th- | 5th-Axis
      4th- | 5th-Axis
      4th- | 5th-Axis View All
      • 4th- | 5th-Axis
    • Product Image Turrets & Live Tooling
      Turrets & Live Tooling
      Turrets & Live Tooling View All
      • Turrets & Live Tooling
    • Product Image Probing
      Probing
      Probing View All
      • Probing
    • Haas Chip & Coolant Management Chip & Coolant Management
      Chip & Coolant Management
      Chip & Coolant Management View All
      • Chip & Coolant Management
    • The Haas Control The Haas Control
      The Haas Control
      The Haas Control View All
      • The Haas Control
    • Product Image Product Options
      Product Options
      Product Options View All
      • Product Options
    • Product Image Tooling & Fixturing
      Tooling & Fixturing
      Tooling & Fixturing View All
      • Tooling & Fixturing
    • Product Image Workholding
      Workholding
      Workholding View All
      • Workholding
    • Product Image 5-Axis Solutions
      5-Axis Solutions
      5-Axis Solutions View All
      • 5-Axis Solutions
      • 5 Easy Steps to 5-Axis
    • QUICK LINKS Special Series  Special Series 
      EU SERIES EU SERIES BUILD & PRICE | PRICE LIST BUILD & PRICE | PRICE LIST In-Stock Machines In-Stock Machines WHAT’S NEW WHAT’S NEW YOUR FIRST CNC YOUR FIRST CNC
      SHOPPING TOOLS
      • Build & Price a Haas
      • Price List
      • Available Inventory
      • CNCA Financing
      WANT TO TALK TO SOMEONE?

      A Haas Factory Outlet (HFO) can answer your questions, and walk you through your best options.

      CONTACT YOUR DISTRIBUTOR >
  • Why Haas Main Menu
      Discover the Haas Difference
    • Why Haas
    • MyHaas
    • Education Community
    • Industry 4.0
    • Haas Certification
    • Customer Testimonials
  • Service Main Menu
      Welcome to Haas Service
      SERVICE HOME Operator’s Manuals How-To Procedures Troubleshooting Guides Preventive Maintenance Haas Parts Haas Tooling Videos
  • Videos Main Menu
  • Main Menu
    • View All
    • View All
    • View All
    • View All
      • HTEC Curriculum Support
      • Haas Value Option Packages (VOP) Journey
    • View All
      • Haas 10 kg Cobot Package
      • Cobot Kits
      • DC-1 Drill Center
      • CNC Sales News
      • Do More With Your Haas
    • View All
    • View All
      • contact-us-test
      • 4 - AUTOMATION SYSTEMS
      • Carousel-V2
      • expert test
      • Demo_Day_Trident-test
      • Link Test
      • image-sale-tag-test
      • article-list-test
      • Haas 25 kg Robot Package
      • test-algolia-page
    • View All
    • View All
    • View All
    • View All
      • calc-test
    • View All
    • QUICK LINKS Special Series  Special Series 
      EU SERIES EU SERIES BUILD & PRICE | PRICE LIST BUILD & PRICE | PRICE LIST In-Stock Machines In-Stock Machines WHAT’S NEW WHAT’S NEW YOUR FIRST CNC YOUR FIRST CNC
      SHOPPING TOOLS
      • Build & Price a Haas
      • Price List
      • Available Inventory
      • CNCA Financing
      WANT TO TALK TO SOMEONE?

      A Haas Factory Outlet (HFO) can answer your questions, and walk you through your best options.

      CONTACT YOUR DISTRIBUTOR >
  • Haas Tooling Main Menu
  • Haas Service Parts Main Menu
My Haas Welcome,
!
Haas Tooling MyHaas/HaasConnect Sign In Register Haas Tooling MyHaas/HaasConnect Sign Out Welcome, My Machines Latest Activity My Quotes My Account My Users Sign Out
Find Your Distributor
  1. Select Language
    1. English
    2. Deutsch
    3. Español - España
    4. Español - México
    5. Français
    6. Italiano
    7. Português
    8. Český
    9. Dansk
    10. Nederlands
    11. Magyar
    12. Polski
    13. Svenska
    14. Türkçe
    15. 中文
    16. Suomi
    17. Norsk
    18. الإنجليزية
    19. български
    20. Hrvatski
    21. Ελληνικά
    22. Română
    23. Slovenský
    24. Slovenščina
    25. 한국어
    26. 日本語
    27. Українська
×

Search Results

Web Pages

Images

    • <
    • 1
    • >

EC - 400 - Pallet Pool Ready - Installation - AD0736

Service Home How To Procedures EC - 400 - Pallet Pool Ready - Installation
Recently Updated Last updated: 09/26/2024

EC - 400 - Pallet Pool Ready - Installation


AD0736

EC - 400 - Pallet Pool Ready - Installation

- Jump to Section - 1. Introduction 2. Installation (12 steps) 3. Smart Servo Amplifier Installation (5 steps) 4. Machine Operation Back to Top

Introduction

The following procedure will show you how to install the Pallet Pool Ready on an EC-400 Horizontal Machining Center.

Requirements:

  • Only compatible with EC-400's built after 07/2018. 
  • The Next Generation software on the machine must be version 100.19.000.1110 or higher.

 Important: Pallets on the EC-400 will not be compatible with the Pallet Pool for machines built between 07/2018 and 9/25/19. Two additional pallets will need to be ordered separately if the 7 pallets want to be used. Machines with inch pallets will order 93-1000504 and machines with metric pallets will order 93-1000503.  
 NOTE: Kits only include one pallet.

Document applies to this kit:

  • 93-1001011: PALLET POOL READY FIELD INSTALL EC-400

Note: Pallet Pool is not included with the Pallet Pool Ready Kit. It must be ordered seperately. Refer to the Pallet Pool Ready Pre-Installation section.

Important: To ensure that the machine does not become mis-aligned, it is recommended that the machine is anchored. Refer to the following link: Anchoring Instructions.

Installation

1

Note: Skip step 1 if the machine came with pins already installed on both pallets.

Dowel pins [1] that are provided in the kit will be added to each side of the 4th axis and APC pallet.

Turn machine ON.

When the machine is powered up, release the E-Stop and home all axes.

Clear any alarms before rotating.

Rotate 4th axis [2] so that the arrow [3] on the pallet [4] is facing towards the spindle to install the pin using a rubber mallet.
 Note: Press E-Stop after pallet has been positioned in order to install each pin [1].

Rotate 4th axis [2] 180 degrees so that the arrow [4] is now facing the H-frame to install the pin using a rubber mallet.

Do an APC pallet change and repeat the process again to install pins to the pallet.

2

Zero return the B-Axis before depressurizing the HPU

Press [DIAGNOSTIC] then navigate to the PARAMETERS tab then navigate to the FACTORY tab.

Set parameter 40.011 HPU 1 TYPE [1] to ON DEMAND [2]. 

 NOTE: Parameter 40.011 HPU 1 TYPE will need to be set to ON DEMAND in order for the depressurize page to work. If it is set to ALWAYS ON or DISABLED the HPU will not depressurize.

3

Depressurize the HPU using the HPU DEPRESSURE page.

Press [DIAGNOSTIC] then navigate to the MAINTENANCE tab [1] then navigate to the HPU DEPRESSURE tab [2]. Press [F3] to depressurize the HPU [3] and the HPU should no longer have pressure in the lines. The text on the screen will display a status that the HPU is safe to use [4]

 NOTE: Parameter 40.011 HPU 1 TYPE will need to be set to ON DEMAND in order for the depressurize page to work. If it is set to ALWAYS ON or DISABLED the HPU will not depressurize.

Release the brake, press E-stop and place lock-out on the machine.

4

Remove ENCL PANL LEFT SERVICE EC-400 [1].

5

 NOTE: For manifold brackets [2] with no access holes, remove the bracket [2] from the enclosure panel [1] and then remove the bracket [2]  from the HYD MANIFOLD [3] to install the HYD MANIFOLD EXTENSION [4] .

 

6

 NOTE: Place a bag or towel beneath the HPU MANIFOLD [3] to catch the excess oil dripping from the manifold ports.

Remove plugs [1] from the HYD MANIFOLD [2].

Lube (2) O-rings [3] and place them on the manifold extension ports. One on Bypass and the other at the Press.
 NOTE: Not installing the O-rings will cause leakage.

Use (4) Bolts and (4) washers to attach HYD MANIFOLD EXTENSION to the HYD MANIFOLD [2].

Connect CBL PP HPU PLT LOWER [5] and LIFT SOLS [6] to the SOLENOID VALVE [7].

7

Release the E-Stop and clear any alarms.

Jog Z axis so that the 4th axis is accessible.

Jog the 4th axis so that you can access and remove the plug [1] on the pallet receiver to depressurize the brake line.

8

NOTE: Receiver was hidden in the image to show the 4th axis platter bleed hole.

Jog 4th axis until the receiver plug hole aligns with the 4th axis platter bleed plug [1].

Loosen the bleed plug about 4 quarter turns but do not fully remove the plug.

Allow the air to bleed from the system by cycling the brake toggling between Z axis and 4th axis multiple times until there is no sound or visible bubbles.

Tighten the bleed plug to the 4th axis platter and then tighten the plug to the pallet receiver.

9

Repressure the HPU using the HPU DEPRESSURE page.

Press [DIAGNOSTIC] then navigate to the MAINTENANCE tab [1] then navigate to the HPU DEPRESSURE tab [2]. Press [F4] to restart the HPU [3].

 

10

A prompt will show up that the pump could start any time.

Press YES [Y] and the pump will restart.

11

The HPU pressure gauge will rise to 600 PSI [1] and the page will display cautionary text that the pump is enabled [2].

NOTE: This image uses a simulator page for reference, the gauge SHOULD NOT read 0 PSI after restarting the pump. 

Verify no leaks are present after restarting the pump. 

12

Install ENCL PANL LEFT SERVICE EC-400 [1].

Smart Servo Amplifier Installation

1

Push [POWER OFF].

Set the main circuit breaker to the [OFF] position.

Lock the main circuit breaker. Use an approved lock with an approved safety tag.

 Danger: If the voltage indicator light is on, do not touch the electrical components. The high voltage in the electrical cabinet can kill you. Wait for the voltage indicator LED to go off fully.

2

Install the ferrite filters to the Command Cables [1,2].

Connect the Command Cable [1] to P15 and Command Cable [2] to P16 to the NGC Main Control PCB.

3

 Note: Remove black [1] DC BUS cable from -H.V. [1] and remove white [2] DC BUS cable from +H.V. [2] from the last amp. These will be connected in the same way on the PS amplifier once installed.

4

Install the smart servo amplifier labeled PR [1].

Connect the other end of the current command cable that is connected to P15 to the smart servo amplifier labeled PR [2].

Connect the high-voltage jumpers [3] to the terminals on the adjacent servo amplifier.

Repeat for PS smart servo amplifier. 

Connect the DC BUS Cables back to the PS amplifier as illustrated in step 3.

5

Connect 33-1580 CBL PP HPU PLT LOWER & LIFT SOLS to P38 on the I/O PCB.

Machine Operation

Verify that all machine functions are operational:

  • Test the pallet changer
  • Check that there are no alarms when running the machine

Recently Viewed Items

You Have No Recently Viewed Items Yet

Feedback
Haas Logo

Haas Delivered Price

This price includes shipping cost, export and import duties, insurance, and any other expenses incurred during shipping to a location in France agreed with you as a buyer. No other mandatory costs can be added to the delivery of a Haas CNC Product.

KEEP UP WITH THE LATEST HAAS TIPS AND TECHNOLOGY...

Sign up now!   

HAAS TOOLING ACCEPTS THE FOLLOWING:

  • Service & Support
  • Owners
  • Request Service
  • Operator Manuals
  • Haas Parts
  • Rotary Repair Request
  • Pre-Install Guides
  • Shopping Tools
  • Build & Price a New Haas
  • Available Inventory
  • The Haas Price List
  • CNCA Financing
  • About Haas
  • Accessibility Statement
  • DNSH Statement
  • Export Compliance
  • Careers
  • Certifications & Safety
  • Contact Us
  • History
  • Terms & Conditions
  • Haas Tooling Terms & Conditions
  • Privacy
  • Warranty
  • Haas Community
  • Haas Certification Program
  • Haas Motorsports
  • Gene Haas Foundation
  • Haas Technical Education Community
  • Events
  • Join the Conversation
  • Facebook
  • X
  • Flickr
  • YouTube
  • LinkedIn
  • Instagram
  • TikTok
© 2026 Haas Automation, Inc – CNC Machine Tools

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

2800 Sturgis Rd., Oxnard, CA 93030
Toll Free: (888) 817-4446 / Fax: 805-278-8554