Search Results

Web Pages

Images

    • <
    • 1
    • >
  • machines
    • Haas Vertical Mills
      Vertical Mills
      • Vertical Mills
      • VF Series
      • Universal Machines
      • VR Series
      • Pallet-Changing VMCs
      • Mini Mills
      • Mold Machines
      • Drill/ Tap/ Mill Series
      • Toolroom Mills
      • Compact Mills
      • Gantry Series
      • Vertical Mill/Turn
      • Extra-Large VMC
      • Double-Column Mills
      • Desktop Mill
      • Mill Auto Parts Loader
    • Product Image
      Multi-Axis Solutions
      • Multi-Axis Solutions
      • 5-Axis Mills
      • Y-Axis Lathes
    • Haas Lathes
      Lathes
      • Lathes
      • ST Series
      • Dual-Spindle
      • Toolroom Lathes
      • Chucker Lathe
      • Haas Bar Feeder V2
      • Lathe Auto Parts Loader
    • Haas Horizontal Mills
      Horizontal Mills
      • Horizontal Mills
      • 50-Taper
      • 40-Taper
    • Haas Rotaries & Indexers
      Rotaries & Indexers
      • Rotaries & Indexers
      • Rotary Tables
      • Indexers
      • 5-Axis Rotaries
      • Extra-Large Rotaries
    • Product Image
      Automation Systems
      • Automation Systems
      • Robot Systems
      • Automatic Parts Loaders
      • Pallet-Pool Systems
      • Haas Bar Feeder
      • Models
    • QUICK LINKS Special Series  Special Series 
      HAAS CAREERS HAAS CAREERS BUILD & PRICE BUILD & PRICE PRICE LIST PRICE LIST WHAT’S NEW WHAT’S NEW YOUR FIRST CNC YOUR FIRST CNC HAAS SIX PACK HAAS SIX PACK
      SHOPPING TOOLS
      • Build & Price a Haas
      • Price List
      • Available Inventory
      • CNCA Financing
      WANT TO TALK TO SOMEONE?

      A Haas Factory Outlet (HFO) can answer your questions, and walk you through your best options.

      CONTACT YOUR DISTRIBUTOR >
  • Options
    • Product Image
      Spindles
      • Spindles
    • Product Image
      Tool Changers
      • Tool Changers
    • Product Image
      4th- | 5th-Axis
      • 4th- | 5th-Axis
    • Product Image
      Turrets & Live Tooling
      • Turrets & Live Tooling
    • Product Image
      Probing
      • Probing
    • Haas Chip & Coolant Management
      Chip & Coolant Management
      • Chip & Coolant Management
    • The Haas Control
      The Haas Control
      • The Haas Control
    • Product Image
      Product Options
      • Product Options
    • Product Image
      Tooling & Fixturing
      • Tooling & Fixturing
    • Product Image
      Workholding
      • Workholding
    • Product Image
      5-Axis Solutions
      • 5-Axis Solutions
      • 5 Easy Steps to 5-Axis
    • Product Image
      Automation
      • Automation
    • QUICK LINKS Special Series  Special Series 
      HAAS CAREERS HAAS CAREERS BUILD & PRICE BUILD & PRICE PRICE LIST PRICE LIST WHAT’S NEW WHAT’S NEW YOUR FIRST CNC YOUR FIRST CNC HAAS SIX PACK HAAS SIX PACK
      SHOPPING TOOLS
      • Build & Price a Haas
      • Price List
      • Available Inventory
      • CNCA Financing
      WANT TO TALK TO SOMEONE?

      A Haas Factory Outlet (HFO) can answer your questions, and walk you through your best options.

      CONTACT YOUR DISTRIBUTOR >
  • Why Haas
      Discover the Haas Difference
      Why Haas MyHaas Education Community Industry 4.0 Haas Certification Customer Testimonials
  • Service
      Welcome to Haas Service
      SERVICE HOME Operator’s Manuals How-To Procedures Troubleshooting Guides Preventive Maintenance Haas Parts Haas Tooling Videos
  • Videos
  • MyHaas – One Place for Everything

    • Compare Quotes
      • Compare Quotes

    • About MyHaas
      • About MyHaas

    • Haas CNC Certification Program
      • Haas CNC Certification Program

    • Haas CNC Certification Program-Redirect
      • Haas CNC Certification Program-Redirect

    • Haas CNC Certification Program
      • Haas CNC Certification Program

    • Haas Learning Resources
      • Haas Learning Resources

    • Haas Global Learning Resources
      • Haas Global Learning Resources

    • MyHaas App Form
      • MyHaas App Form
    • QUICK LINKS Special Series  Special Series 
      HAAS CAREERS HAAS CAREERS BUILD & PRICE BUILD & PRICE PRICE LIST PRICE LIST WHAT’S NEW WHAT’S NEW YOUR FIRST CNC YOUR FIRST CNC HAAS SIX PACK HAAS SIX PACK
      SHOPPING TOOLS
      • Build & Price a Haas
      • Price List
      • Available Inventory
      • CNCA Financing
      WANT TO TALK TO SOMEONE?

      A Haas Factory Outlet (HFO) can answer your questions, and walk you through your best options.

      CONTACT YOUR DISTRIBUTOR >
  • Haas Tooling
      Haas Tooling Mill Toolholding Mill Workholding Milling Lathe Tooling Lathe Toolholding Lathe Workholding ER Collets & Chucks Holemaking Threading Tool Management Tooling Accessories Package Kits Measuring & Inspection Apparel & Accessories
      HAAS TOOLING QUICK LINKS
      NEW PRODUCTS NEW PRODUCTS
      MOST POPULAR MOST POPULAR
      OPEN TERMS OPEN TERMS
      FINANCING FINANCING
      FAQs FAQs
      KITS CREATED FOR YOU KITS CREATED FOR YOU
  • Haas Service Parts
      Haas Service Parts Automatic Pallet Changer Automatic Tool Changer Chip Management Coolant Counterbalance Electrical Cabinet Enclosure Field Install Options Hydraulics Lubrication Maintenance Pendant Probing Rotary Spindle Tailstock
  • Contact Us

My Cart
MyHaas Welcome,
!
Haas Tooling Guest Order History MyHaas/HaasConnect Sign In Register Haas Tooling My Account Order History Return History MyHaas/HaasConnect Sign Out Welcome, My Machines Latest Activity My Quotes My Account My Users Sign Out
Find A Dealer
  1. Select Language
    1. English
    2. Deutsch
    3. Español - España
    4. Español - Méjico
    5. Français
    6. Italiano
    7. Português
    8. Český
    9. Dansk
    10. Nederlands
    11. Magyar
    12. Polski
    13. Svenska
    14. Русский
    15. Türkçe
    16. 中文
    17. Suomi
    18. Norsk
    19. الإنجليزية
    20. български
    21. Hrvatski
    22. Ελληνικά
    23. Română
    24. Slovenský
    25. Slovenščina
    26. 한국어
    27. 日本語
Search
×

Search Results

Web Pages

Images

    • <
    • 1
    • >

UMC-750/1000 Pallet Pool - Installation

Service Home How To Procedures UMC-750/1000 Pallet Pool - Installation

UMC-750/1000 Pallet Pool - Installation

- Jump to Section - Back to Top
Recently Updated Last updated: 01/18/2022

UMC - 750/1000PP Version 2 - Installation


Pallet Pool Installation Video

Introduction

The following procedure will show you how to install a Pallet Pool on a UMC-750 and UMC-1000 machine.

The Next Generation software on the machine must be version 100.20.000.1110 or higher.

The Pallet Pool option is currently not field installable.

Important: To ensure that the Pallet Pool does not become mis-aligned, it is recommended that the machine and Pallet Pool be anchored. Refer to the following link: Anchoring Instructions.

The Pallet Pool option has a room for a total of 9 pallets that can be installed on a UMC-750/1000 with the Pallet Pool option.

The Pallet Pool has 2 servo axes. The PR axis rotates the Pallet Pool ram and the PS axis extends and retracts the Pallet Pool ram to load/unload the pallets.

The UMC-750/1000 must be level before the Pallet Pool can be installed. Refer to the installation procedures linked below:

  • UMC-750 Installation
  • UMC-1000 Installation

Push [POWER OFF].

Set the main circuit breaker to the OFF position.

Lock the main circuit breaker. Use an approved lock with an approved safety tag.

Caution: When you handle a PCB, you must wear an Electrostatic Discharge (ESD) strap.

To level the machine without the Pallet Pool connected to the machine, do the following: 

Make sure that there is a shorting block [1] installed on the top two pins of the P12 connector on the I/O PCB 

Make sure there is a jumper (P/N 33-0527) [2] connected to I/O PCB at P14.
 Note: These jumpers are needed to operate the machine without the Pallet Pool.

Disable the pallet pool, change setting 382 Disable Pallet Changer to Pallet Pool.


Note: The above step will disabled the Pallet Pool to allow you to zero return the machine so it can be leveled.

Leveling Screws Hardware

Note: The washers [1] and nuts [2] are installed during shipping and should be saved for installation and not be discarded.

Note: The washer orientation [3] is important.  The conical part of the washer should be against the casting,  see illustration.

Mating the Pallet Pool

   

1

Remove the loading station door blocking bolt [1].

Make sure to raise all of the pallet shelf supporting screws [2] before placing the pallet pool on the floor. 

2

Remove 25-14314 cross bracing from the pallet pool

3

Install the drip tray [1] on the bottom of the auto window, this component should slide right on the window. 

4

Remove the bolts [1] to remove the shipping brackets. There are two brackets, the first [2] that hold the forks to the loading station, and the bottom [3] that just holds the loading station. 

5

Install the Pallet Pool alignment blocks onto the host machine's base.

Note: The alignment block with the radius [2] must be installed towards the back of the UMC and the alignment block with the flat side [1] must be installed towards the front of the machine. Use the three SHCS 3/8-16 X 2 and the one SHCS 3/8-16 X 1 3/8 [4].

Install the alignment bars [3] onto the pallet pool base.

 NOTE: Use the CABCOOL as a height reference in relation to the pallet pool enclosure opening.

Move the pallet pool assembly so the alignment arms are 3 - 6” (76 - 152 mm) away from the alignment blocks. 

Install the leveling pads under the pallet pool and lower the pallet pool. 

6

Use a pallet jack or forklift to move the pallet pool close to the machine.

A decal has been placed on the rear of the machine to indicate where the pallet forks should lift the machine from.

NOTE: Have the pallet jack pick up the pallet pool from the opposite side of where the slide window would be.

7

Install the turnbuckles [3] with the provided hardware (SHCS, washer, and bushings [1]) onto the alignment arms [2] and the base casting [4].

NOTE: The side of the turnbuckle with the two bushings should be installed on the side of the pallet pool.

Evenly tighten the turnbuckles until the alignment arms are almost tight against the alignment bars, STOP once the alignment bars areapproximately 1-2" away from the alignment blocks.

Adjust the height of the pallet pool so that the height of the alignment bars are to the center of the blocks before tightening the turnbuckles flush to the alignment blocks. Raise or lower the pallet pool leveling screws evenly when doing so.

Continue to evenly tighten the turnbuckles until the alignment arms are tight against the alignment blocks.

Once the alignment bars and vlocks are evenly flush to each other loosen up the turn buckles.

8

Turn [OFF] the main circuit breaker and wait until the Vector Drive High-Voltage light turns off.

 Note: The PR (Pallet Rotate) and PS (Pallet Slide) amps are already installed at the factory.

Knock out the pre-cut access panel [1].

Route the pallet pool cables [2] into the control cabinet as shown in the illustration.

Connect the PR motor encoder cable to Maincon PCB channel 15
Connect the PS motor encoder cable to Maincon PCB channel 16.

Connect the PR motor power cable to the amplifier labeled PR. Install the ferrite filter bead on the motor power cable.

Connect the PS motor power cable to the amplifier labeled PS. Install the ferrite filter bead on the motor power cable.

9

Updated

Connect the air gun hose [1] to the air line under the pallet pool [2]. 

Route the air hose from the pallet pool to line coming from the the lube cabinet [3].

Connect the air line from the pallet pool to the to the T-fitting [4] connecting the machine air gun line to the lube cabinet.

Follow the line from the lube cabinet [5] to help locate the T-fitting.

10

Updated

Connect the hydrualic lines to the bulkhead. The pallet clamp [1] is marked with a green zip tie and pallet unclamp [2] is marked with a red zip tie. The hydraulic lines should run through the conduit neatly.

NOTE: The bulkhead uses quick disconnects  for the hydraulic hoses. The clamp side has the male side quick disconnect [3] and the unclamp has the female side [4], this is to avoid switching the hoses.

Route the HPU oil level sensor cable 32-0423 from the HPU to the connector bracket [5].

11

Connect HPU UP/ DWN SOL [1] to P38.

Connect HPU PUMP PWR [2] to P31.

Connect HPU THRML PROBE [3] to P46.

Connect HPU PALLET CLMP SOL  [4] to P35.

Connect HPU PRESSURE SNSR [5] to P48.

Remove the jumper connection from the P14 [6] connector on the I/O PCB.

Connect PP STATUS SWITCHES [7] to P14

Remove the shorting block from the P12 [8] connector on the I/O PCB

Connect PALLET CHNGR STATION [9] to P12

Connect PALLET ALRAM [10]  to P50.

Make sure all the Pallet Pool status bracket connectors are plugged into the correct location.

 NOTE: Store the Pallet Pool jumpers in a safe location, these will be used by the service personnel to move or service the machine.

12

Route the HPU PUMP PWR cable  to P1 on the TMD card located on the I/O PCB hinged door. 

The rest of the components in this image are already connected but this diagram can be used as reference. 

13

Set the main circuit breaker to the ON position.

Push [POWER ON].

Zero Return all the Axis'

Do the following to enable the pallet pool option on a UMC-500.  

Important:  You will need to do this step if you perform a option 5 clean install option on a UMC-500 with a pallet pool.

Set setting 382 Disable Pallet Changer to None.

Find the Haas Pallet Pool Parameters decal on the E-Stop on the Pallet Pool machine.  Write down the values.

Use the USB Service key to go into Service Mode.

Press [DIAGNOSTIC] Go to the PARAMETERS> Factory setting tab.

Set the following factory settings values:

  1. 2128 [:] Pallet Pool Type = HPU Lift
  2. 40.011 (HPU 1 Type ) = On Demand
  3. 15.019 [:] PR-Axis Invisible = False
  4. 16.019 [:] PS-Axis Invisible = False
  5. 15.004 [:] PR-Axis Disable = False
  6. 16.004 [16:3] PS-Axis Disabled = False
  7. Turn TMD card on
Set the Grid and TC offsets for PR and PS axis
 
  1. 15.078 PR-Axis Tool Change Offset = Use the decal value.
  2. 15.140 PR-Axis Grid Offset = Use the decal value.
  3. 16.078 PS-Axis Tool Change Offset = Use the decal value.
  4. 16.140 PS-Axis Grid Offset = Use the decal value.
  5. Zero Return after the grid offset is adjusted

Base Level Pallet Pool

1

Verify all outer supports legs are NOT touching the floor.

Make sure the pallet pool sit on 3 points, the leveling foot that is not touching the puck is the one closest to the machine control cabinet [1].

2

Move the ram to its home position if it is not already, place the bubble level on ram and rough level with respect to X & Y. 

NOTE: Rough level by adjusting the 3 leveling feet without adjusting the 4th in the air.

Align Pallet Drop Off Station

1

Insert the Service Key USB and put the machine in Service Mode.

Make sure there are no obstructions inside the machine or inside the pallet pool area. Pull out all the [E-STOPS] and [RESET] the alarms.

Press [ZERO RETURN] and then press [ALL]. The machine will zero return all the axes.

Once all the axis are zero returned press [RECOVER]. A pop up box will appear, select [2] for Pallet Changer Recovery.

2

The Pallet Changer Recovery screen shows the Pallet Pool Status. Make sure the Pallet Lifter is Down [1]. If not press [ALTER] to bring the Pallet Lifter down.

Press [J] and then the [DELETE] button. This will rotate the pallet lifter towards station J.

Press [F1] to open the auto window [3].

 

3

While still in the pallet recovery page press [J] then [DELETE] to rotate pallet pool to J position.

Open the window by pressing [F1] then press [+Z] to select Pallet slide Axis manually slide the RAM in the machine to the pickup location.

NOTE: Jog the slide axis slownly and make sure the bottom of the forks clear the receiver casting. Raise the pallet pool evenly if they do not.

With the Pallet Pool in the down position, use the Gap Gauge [1] 25-14354 to set the gap by adjusting the height of the Pallet Pool. Evenly raise or lower the pallet pool leveling screws in accordance to the gap gauge.

NOTE: The pallet pool should still be only on 3 points while adjusting the gap.

 

4

Adjust the pallet pool slider by jogging the PS or PR axis so the forks align correctly underneath the pallet.

The RAM should still be in its slide position, adjust the PR position by pressing [-Z] to select the Pallet Rotate Axis  on the pallet recovery page.  

Press [F2] to unclamp the pallet and press [ALTER] to lift and lower the pallet to make sure the pallet falls onto the pins smoothly. Continuouly make adjustments to the PR and PS axis to make sure the pins are aligned to the holes.

 WARNING: The air blast on the receiver makes a loud noise ear plugs are recommended.

Press [Recovery] to get out of pallet recovery and go to Factory Settings 2139 [:] Shelf J Slide Offset and 2149 [:] Shelf J Rotary Offset, and make sure the values match the PS and PR axis position, if they do not update the values.

NOTE: You should be able to align the pallet pool using factory settings 2136 and 2146 only, if it becomes difficult to do so with only these two settings adjust Parameter 7.310 this is the position that the C-axis will rotate to during a pallet change operation.

Manually remove the pallet from the machine. 

Finally, drop the fourth leveling screw onto the puck.

 

5

Re-enter the pallet recovery page and make sure the pallet is unclamped before pressing [INSERT] to return the RAM to the pallet pool area.

Press [A] then [DELETE] to rotate the RAM to its home position.

Press [A] and [UNDO] to slide the RAM to its home position.

Verify that the level is still acceptable in the X & Y direction [1].

Once verified, zero return the PR and PS axis.

Align Pallet Loading Station

1

Load a pallet onto the loading station, and with the RAM in the loading station use the gap gauge 25-14354 to set the gap between the pins on the RAM forks and the pallet. 

Adjust the two loading station leveling feet until the gap is set. Raise and lower the pallet to ensure it does so smoothly. 

Setting Up Pallet Stations

1

Lower all outer leveling feet [1] to the ground by hand then rotate each leveling foot by another 1/2 turn [2]. 

2

Please refer to the PALLET POOL OPERATORS MANUAL for how to load the pallets onto the machine using the Pallet Scheduling Table.

3

Place the provided tote under the Pallet Pool coolant discharge tray to catch the coolant and chips that drains from the pallets.

Empty the tote as needed. 

Test the pick up / drop off operation on the remaining stations by using the pallet pool recovery functions.  

Install the anchors.

Install the Pallet Pool guard panels.

FIND DISTRIBUTOR
Feedback
Haas Logo

美元价格不包括关税、报关费用、保险费、增值税及运费。
USD prices DO NOT include customs duty, customs fees, insurance, VAT, or freight.

人民币价格包含关税、报关费用、货运保险和增值税, 但不包括运费。
CNY prices include customs duty, customs fees, insurance, and VAT. DOES NOT include freight.

Haas Delivered Price

This price includes shipping cost, export and import duties, insurance, and any other expenses incurred during shipping to a location in France agreed with you as a buyer. No other mandatory costs can be added to the delivery of a Haas CNC Product.

KEEP UP WITH THE LATEST HAAS TIPS AND TECHNOLOGY...

Sign up now!   

HAAS TOOLING ACCEPTS THE FOLLOWING:

  • Service & Support
  • Owners
  • Request Service
  • Operator Manuals
  • Haas Parts
  • Rotary Repair Request
  • Pre-Install Guides
  • Shopping Tools
  • Build & Price a New Haas
  • Available Inventory
  • The Haas Price List
  • CNCA Financing
  • About Haas
  • Careers
  • Certifications & Safety
  • Contact Us
  • History
  • Terms & Conditions
  • Haas Tooling Terms & Conditions
  • Privacy
  • Warranty
  • Haas Community
  • Haas Certification Program
  • Haas Motorsports
  • Gene Haas Foundation
  • Haas Technical Education Community
  • Events
  • Join the Conversation
  • Facebook
  • Twitter
  • Flickr
  • YouTube
  • LinkedIn
  • Instagram
  • TikTok
© 2022 Haas Automation, Inc – CNC Machine Tools

2800 Sturgis Rd., Oxnard, CA 93030 / Toll Free: 800-331-6746
Phone: 805-278-1800 / Fax: 805-278-2255

Cookie Notice

We use cookies to improve your user experience. Our Cookie Notice describes which cookies we use, why we use them, and how you can find more information about them. Please confirm you consent to us using analytics cookies. If you do not consent, you may still use our website with a reduced user experience.

Manage Settings

Cookie Notice

We use cookies to improve your user experience. Our Cookie Notice describes which cookies we use, why we use them, and how you can find more information about them. Please confirm you consent to us using analytics cookies. If you do not consent, you may still use our website with a reduced user experience.

Functional Cookies

Analytics Cookies