×

Search Results

Web Pages

Images

    • <
    • 1
    • >
  • machines
    • Haas Vertical Mills
      Vertical Mills
      • Vertical Mills
      • VF Series
      • Universal Machines
      • VR Series
      • Pallet-Changing VMCs
      • Mini Mills
      • Mold Machines
      • Drill/ Tap/ Mill Series
      • Toolroom Mills
      • Compact Mills
      • Gantry Series
      • Vertical Mill/Turn
      • Extra-Large VMC
      • Double-Column Mills
      • Desktop Mill
      • Mill Auto Parts Loader
    • Product Image
      Multi-Axis Solutions
      • Multi-Axis Solutions
      • 5-Axis Mills
      • Y-Axis Lathes
    • Haas Lathes
      Lathes
      • Lathes
      • ST Series
      • Dual-Spindle
      • Toolroom Lathes
      • Chucker Lathe
      • Haas Bar Feeder V2
      • Lathe Auto Parts Loader
    • Haas Horizontal Mills
      Horizontal Mills
      • Horizontal Mills
      • 50-Taper
      • 40-Taper
    • Haas Rotaries & Indexers
      Rotaries & Indexers
      • Rotaries & Indexers
      • Rotary Tables
      • Indexers
      • 5-Axis Rotaries
      • Extra-Large Rotaries
    • Product Image
      Automation Systems
      • Automation Systems
      • Robot Systems
      • Automatic Parts Loaders
      • Pallet-Pool Systems
      • Haas Bar Feeder
      • Models
    • QUICK LINKS Special Series  Special Series 
      HAAS CAREERS HAAS CAREERS BUILD & PRICE BUILD & PRICE PRICE LIST PRICE LIST WHAT’S NEW WHAT’S NEW YOUR FIRST CNC YOUR FIRST CNC HAAS SIX PACK HAAS SIX PACK
      SHOPPING TOOLS
      • Build & Price a Haas
      • Price List
      • Available Inventory
      • CNCA Financing
      WANT TO TALK TO SOMEONE?

      A Haas Factory Outlet (HFO) can answer your questions, and walk you through your best options.

      CONTACT YOUR DISTRIBUTOR >
  • Options
    • Product Image
      Spindles
      • Spindles
    • Product Image
      Tool Changers
      • Tool Changers
    • Product Image
      4th- | 5th-Axis
      • 4th- | 5th-Axis
    • Product Image
      Turrets & Live Tooling
      • Turrets & Live Tooling
    • Product Image
      Probing
      • Probing
    • Haas Chip & Coolant Management
      Chip & Coolant Management
      • Chip & Coolant Management
    • The Haas Control
      The Haas Control
      • The Haas Control
    • Product Image
      Product Options
      • Product Options
    • Product Image
      Tooling & Fixturing
      • Tooling & Fixturing
    • Product Image
      Workholding
      • Workholding
    • Product Image
      5-Axis Solutions
      • 5-Axis Solutions
      • 5 Easy Steps to 5-Axis
    • Product Image
      Automation
      • Automation
    • QUICK LINKS Special Series  Special Series 
      HAAS CAREERS HAAS CAREERS BUILD & PRICE BUILD & PRICE PRICE LIST PRICE LIST WHAT’S NEW WHAT’S NEW YOUR FIRST CNC YOUR FIRST CNC HAAS SIX PACK HAAS SIX PACK
      SHOPPING TOOLS
      • Build & Price a Haas
      • Price List
      • Available Inventory
      • CNCA Financing
      WANT TO TALK TO SOMEONE?

      A Haas Factory Outlet (HFO) can answer your questions, and walk you through your best options.

      CONTACT YOUR DISTRIBUTOR >
  • Why Haas
      Discover the Haas Difference
      Why Haas MyHaas Education Community Industry 4.0 Haas Certification Customer Testimonials
  • Service
      Welcome to Haas Service
      SERVICE HOME Operator’s Manuals How-To Procedures Troubleshooting Guides Preventive Maintenance Haas Parts Haas Tooling Videos
  • Videos
  • MyHaas – One Place for Everything

    • Compare Quotes
      • Compare Quotes

    • About MyHaas
      • About MyHaas

    • Haas CNC Certification Program
      • Haas CNC Certification Program

    • Haas CNC Certification Program-Redirect
      • Haas CNC Certification Program-Redirect

    • Haas CNC Certification Program
      • Haas CNC Certification Program

    • Haas Learning Resources
      • Haas Learning Resources

    • Haas Global Learning Resources
      • Haas Global Learning Resources

    • MyHaas App Form
      • MyHaas App Form
    • QUICK LINKS Special Series  Special Series 
      HAAS CAREERS HAAS CAREERS BUILD & PRICE BUILD & PRICE PRICE LIST PRICE LIST WHAT’S NEW WHAT’S NEW YOUR FIRST CNC YOUR FIRST CNC HAAS SIX PACK HAAS SIX PACK
      SHOPPING TOOLS
      • Build & Price a Haas
      • Price List
      • Available Inventory
      • CNCA Financing
      WANT TO TALK TO SOMEONE?

      A Haas Factory Outlet (HFO) can answer your questions, and walk you through your best options.

      CONTACT YOUR DISTRIBUTOR >
  • Haas Tooling
      Haas Tooling Mill Toolholding Mill Workholding Milling Lathe Tooling Lathe Toolholding Lathe Workholding ER Collets & Chucks Holemaking Threading Tool Management Tooling Accessories Package Kits Measuring & Inspection Apparel & Accessories
      HAAS TOOLING QUICK LINKS
      NEW PRODUCTS NEW PRODUCTS
      MOST POPULAR MOST POPULAR
      OPEN TERMS OPEN TERMS
      FINANCING FINANCING
      FAQs FAQs
      KITS CREATED FOR YOU KITS CREATED FOR YOU
  • Haas Service Parts
      Haas Service Parts Automatic Pallet Changer Automatic Tool Changer Chip Management Coolant Counterbalance Electrical Cabinet Enclosure Field Install Options Hydraulics Lubrication Maintenance Pendant Probing Rotary Spindle Tailstock
  • Contact Us

My Cart
MyHaas Welcome,
!
Haas Tooling Guest Order History MyHaas/HaasConnect Sign In Register Haas Tooling My Account Order History Return History MyHaas/HaasConnect Sign Out Welcome, My Machines Latest Activity My Quotes My Account My Users Sign Out
Find A Dealer
  1. Select Language
    1. English
    2. Deutsch
    3. Español - España
    4. Español - Méjico
    5. Français
    6. Italiano
    7. Português
    8. Český
    9. Dansk
    10. Nederlands
    11. Magyar
    12. Polski
    13. Svenska
    14. Русский
    15. Türkçe
    16. 中文
    17. Suomi
    18. Norsk
    19. الإنجليزية
    20. български
    21. Hrvatski
    22. Ελληνικά
    23. Română
    24. Slovenský
    25. Slovenščina
    26. 한국어
    27. 日本語
Search
×

Search Results

Web Pages

Images

    • <
    • 1
    • >

UMC Hydraulic Workholding - Installation - AD0499

Service Home How To Procedures UMC Hydraulic Workholding - Installation AD0499

UMC Hydraulic Workholding - Installation AD0499

- Jump to Section - Back to Top
Recently Updated Last updated: 02/11/2022

UMC Hydraulic Workholding - Installation


AD0499

Introduction

This procedure will explain how to install the hydraulic workholding assembly on UMC reboot machines. 

This procedure applies to the following kits:

93-1000455 HYD WORKHOLDING  FIELD INSTALL UMC 500
93-1000456 HYD WORKHOLDING  FIELD INSTALL UMC 750
93-1000457 HYD WORKHOLDING  FIELD INSTALL UMC 1000

Prerequisites

  • Software Version 100.20.000.1110 or higher
  • A hinge door over the I/O PCB.
    Important: 93-1000573 I/O DOOR ASSY HINGED order the hinge door if it did not come in the kit.

Installation

1

Assemble the hydraulic manifold as shown:

[1] FITG POLY3/8F NPT1/4M 90 BRASS

[2]  FITG ORB6M JIC6M STR STL (2x)

[3] O-Ring 2-212 (4x)

 

2

Connect the staff to the staff extension using [2] SHCS 1/4-20 X 5/8 make sure the O-Ring 2-011 [1] are seated in the cavaties of the shaft.

Torque the bolts to their required specs.

 

3

Press the dowel pin [1] into the anti-rotation block [2] until it bottoms out. 

4

Assemble the platter coupler by installing the SHCS 5/16-18 X 1/2 [1] and O-Ring 2-011 [2] these will serve as plugs to the hydraulic lines until the workholding is installed. 

Finish assembling the coupler by installing O-Ring 2-031 [3] into the groove of the coupler [4].

5

Rotate the B-axis +90 degrees and remove the cover [1]. Return the B-axis to its original position at 0 degrees.

6

Remove the platter by following the removal section of the UMC C-Axis Platter Replacement linked below.

 WARNING: IF YOU DO NOT DISENGAGE THE BRAKE AND DISCONNECT THE LINES YOU CAN PERMANENTLY DAMAGE THE BRAKE BY REMOVING THE PLATTER.

UMC C-Axis Platter Replacement

7

Place the platter on a bench and bolt the coupler [1] to the platter using SHCS 1/4-20 X 5/8 [2].

While the platter is on the bench insert the felt strip included in the kit in the groove [3]

NOTE: If the UMC is not exchanging platters reuse the felt strip already in the groove. 

Torque the bolts to their required specs.

8

Install the coupler onto the shaft assembly [1] by using 1/4-20 X 1 1/4 bolts [3]. Make sure the O-Rings 2-011 [2] are in the cavaties of the shaft and not where the bolts attach.

Torque the bolts to their required specs.

9

Install the coupler and platter assembly [2] back onto the rotary using M12 bolts [1].

Tighten the bolts, but do not torque them down yet.

Follow the installation section of the UMC C-Axis Platter Replacement linked below for the full instruction on how to correctly reinstall the platter.

UMC C-Axis Platter Replacement

10

Rotate the B-axis 90 degrees [1].

11

Attach the anti-rotation block [3] to the gearbox using the M6 bolts [4].

If the read head is in configuration [1] you will need to clock it to position [2]  this will require you to redo the compensations on the machine.

If the read head is in configuration [2] the compensations will not need to be redone.

Torque the bolts to their required specs.

Please contact service about borrowing a swivel checker.

12

Install the shaft and manifold assembly [1] by pressing the dowel pin [2] into the hydraulic manifold.

13

Install the shaft assembly to the hydraulic manifold make sure to install the snap ring [2] to the shaft groove [1].

 

14

The HPU cables will be routed to a box under the control cabinet from there the HPU will have a 6 foot placement radius [1] so that the customer has the freedom to place it where they like. This section of cables will be contained in a conduit.

15

Install the pallet air blast solenoid [1] to the lube panel as shown, route the hose from the solenoid over the top of the machine and into the sheet metal.

16

Follow the wiring diagram  for the electrical components all of the wiring will make its way through the box under the control cabinet and to the I/O board.

If the machine does not come with a I/O HINDGED DOOR you will need to install it, follow the I/O HINGED DOOR PROCEDURE for instructions on how to install it.

A food pedal cable will also be routed from the front skirt [1] of the machine along the side skirt into the box under the control cabinet and connected to the I/O board as shown.

17

Install the side of the hose with the filters [1]  to the HPU, there are zip ties indicating which hose is clamp and unclamp.

The RED zip tie indicates the CLAMP hydraulic hose.

The GREEN zip tie indicates the UNCLAMP hydraulic hose.

18

Route the hydraulic lines from the HPU [1] through the center thru bore of the B-axis body. The air line [2] will also be routed along with the hydraulic lines.

19

Pull the hoses through the B-axis body and to the hydraulic manifold as shown. Use the zip ties and cable clamps to neatly route the cables to the hydraulic manifold.

The unclamp denoted in green [1] goes the fittings as shown, and the clamp hose denoted in red [2] is also as shown. The airline [3] will attach to the elbow fitting on the manifold. 

NOTE: Make sure to match the clamp and unclamp hose with the same color zip ties on the manifold fittings. 

20

Add the decal to the tank of the HPU as shown.

21

Reinstall the new cover [2] and return the rotary [1] to 0 degree's on the B axis.

22

Attach the decal [1] (PN: 29-1171) that shows the correct method for cleaning the platter and rotary union port on the front of the UMC.

23

Please refer to the link to install the Hydraulic Vise option.

UMC Hydraulic Vise - Installation/Removal - AD0514
Option - Activation Code + Patch - NGC

24

Please refer to the link to verify/load any patches involved with the installation.

FIND DISTRIBUTOR
Feedback
Haas Logo

美元价格不包括关税、报关费用、保险费、增值税及运费。
USD prices DO NOT include customs duty, customs fees, insurance, VAT, or freight.

人民币价格包含关税、报关费用、货运保险和增值税, 但不包括运费。
CNY prices include customs duty, customs fees, insurance, and VAT. DOES NOT include freight.

Haas Delivered Price

This price includes shipping cost, export and import duties, insurance, and any other expenses incurred during shipping to a location in France agreed with you as a buyer. No other mandatory costs can be added to the delivery of a Haas CNC Product.

KEEP UP WITH THE LATEST HAAS TIPS AND TECHNOLOGY...

Sign up now!   

HAAS TOOLING ACCEPTS THE FOLLOWING:

  • Service & Support
  • Owners
  • Request Service
  • Operator Manuals
  • Haas Parts
  • Rotary Repair Request
  • Pre-Install Guides
  • Shopping Tools
  • Build & Price a New Haas
  • Available Inventory
  • The Haas Price List
  • CNCA Financing
  • About Haas
  • Careers
  • Certifications & Safety
  • Contact Us
  • History
  • Terms & Conditions
  • Haas Tooling Terms & Conditions
  • Privacy
  • Warranty
  • Haas Community
  • Haas Certification Program
  • Haas Motorsports
  • Gene Haas Foundation
  • Haas Technical Education Community
  • Events
  • Join the Conversation
  • Facebook
  • Twitter
  • Flickr
  • YouTube
  • LinkedIn
  • Instagram
  • TikTok
© 2022 Haas Automation, Inc – CNC Machine Tools

2800 Sturgis Rd., Oxnard, CA 93030 / Toll Free: 800-331-6746
Phone: 805-278-1800 / Fax: 805-278-2255

Cookie Notice

We use cookies to improve your user experience. Our Cookie Notice describes which cookies we use, why we use them, and how you can find more information about them. Please confirm you consent to us using analytics cookies. If you do not consent, you may still use our website with a reduced user experience.

Manage Settings

Cookie Notice

We use cookies to improve your user experience. Our Cookie Notice describes which cookies we use, why we use them, and how you can find more information about them. Please confirm you consent to us using analytics cookies. If you do not consent, you may still use our website with a reduced user experience.

Functional Cookies

Analytics Cookies